The Senior Design sequence is about to embark on the third
stage of the design - building and evaluating the prototype. Since
September 2001 I have been designing an electric bicycle, somewhat
in parallel with the Senior Design sequence, but without some
of the restrictions that have been imposed on the Senior Design
project (refer: www.eBiciBikes.com).
The current design of the eBici bike is shown in the picture.
One should always begin a design with precedent. I first came across the welded handlebar T structure on the very popular BikeE recumbent bicycle. Check out the picture of Dr. Bob proudly sitting on his BikeE, comfortably holding his handlebar T. During 2000 I designed the Grasshopper 5 FWD (front wheel drive) and RWD (rear wheel drive) recumbent bikes in which I did use a similar design for the handlebar T. I first made them out of thinwalled stainless steel, however discovered that the stress placed on the handlebars were such that the handlebars actually bent - so I replaced them with 4130 Chromoly steel. I have noticed that on the scooter design only one team has considered the stress placed on the handlebar T by the rider - it can be quite significant.
One of the major problems of manufacturing the handlebar stem is having the stem welded square and central to the handlebar. This requires a fixture to hold the pieces in place while it is being welded. Even the well controlled TIG welding process (which I use exclusively) will cause the pieces to bend and distort during the welding process. For prototype purposes a welding fixture can be made out of thick plywood - since it is only required for one time usage it does not matter if it gets burned and destroyed during the welding process, however for a repeatable manufacturable process a professional fixture should be built. We had our fixture built by master machinist Dwight Griesemer from Reading, PA who has been building fixtures for many years.
We first prepare the tubes for welding by "notching" the handlebar stem, so that it will fit smoothly on the handlebar (notcher1, notcher2). The welding fixture is shown in the following picture. Click on the picture to see how the tubes are mounted on the fixture. The welder will first weld the one side, flip and clamp the tube, and then complete the weld on the other side.